top of page

WASTER LANDFILL OPERATION

Date 14/12/ 2019
This is the proposal for a 5000 tonne per day facility for waste recycling and turning traditional landfill into fuel biscuits for power plant operation in Victoria, that is currently under development in and around the Port Anthony area.
The top brand names in waste have already agreed to use the facility for current waste disposals as this also lowers the cost of waste landfill operations by as much as 40%

WASTER LANDFILL OPERATION

©2020,ROCKPOWER建築事務所和ROCKPOWER信息技術部版權所有。由ROCKPOWER 信息技術 創建

  • Facebook
  • Linkedin
  • Instagram
bottom of page